In July 2007, Jieyang and Zhuhai jointly built Zhuhai (Jieyang) industrial transfer park within the scope of Jieyang high tech Zone, with the overall planning area of 28.36 square kilometers and the first phase of 4.38 square kilometers. In June 2008, the provincial government agreed to the construction. In July 2009, it successfully applied for the provincial demonstration industrial transfer park.
survey
The location advantage is obvious. The park is located in the center of the one hour economic circle in East Guangdong. It is located at the intersection of the Pearl River Delta economic zone and the West Coast Economic Zone, and at the center of the economic cooperation zones in Southeast Fujian, southwest Jiangxi and East Guangdong, with a radiation population of more than 50 million. convenient transportation. It is 60 km away from the seaport, 40 km away from Jieyang Chaoshan airport and Xiamen Shenzhen high speed railway, 15 km away from Jiepu Hui expressway, and the reconstruction project of provincial highway 335 will be completed in the near future. sufficient land reserves. The planned land area is 13 square kilometers. At present, 8884 mu of land has been expropriated and pre leased, with broad development space. complete facilities. Longjing reservoir, adjacent to the park, stores 200 million cubic meters of water throughout the year, ensuring water supply. The investment promotion service hall, water supply facilities, sewage treatment plant, western road network and 110000V substation have been completed and put into use. A number of infrastructure projects, such as scientific and technological innovation platforms and supporting living areas, have been stepped up. The surrounding area is also equipped with Jingming resort, Dabeishan Forest Park and Dayang resort.
present situation
The park invested 1.173 billion yuan in infrastructure construction. According to the positioning of "ecological garden and characteristic city", according to the requirements of the industrial layout of the whole province, and combined with the industrial foundation of Jieyang, three industrial zones of hardware and stainless steel products, mechanical equipment manufacturing and electronic information are planned and constructed. The park has introduced 72 projects (including 66 industrial projects and 6 service projects), with a total investment of nearly 30 billion yuan and an estimated total output value of over 50 billion yuan. Among the 66 industrial projects, 32 have been built and put into operation, 21 are under construction and 13 are to be built, with a total investment of 8.2 billion yuan. A number of large and good projects have settled in the park. The park firmly implements the strategic plan of the new municipal Party committee and government. On the basis of laying the foundation, creating the environment, attracting investment and projects, grasping the progress and promoting production in the past few years, the Park focuses on building the third platform for Jieyang's economic development, and the strategic goal of building a new industrialization pilot area, a high-end industry cluster area and a sustainable development demonstration area with developed industry and high integration of green space, so as to promote the development of the park With scientific and technological innovation as the guide, high-end industries as the support, and system innovation as the driving force, the park has changed its development mode, vigorously developed strategic emerging industries, built a platform for scientific and technological innovation, promoted independent innovation, transformation and upgrading of enterprises, and achieved initial results in scientific development.
Policies and services
The park has issued a series of supportive and preferential measures, such as "Interim Measures for encouraging preferential investment", to provide financial subsidies and loan guarantee for enterprises in line with supportive policies. In addition, flexible preferential service measures are adopted according to different industrial grades. Efforts should be made to promote the construction of scientific and technological innovation service platform, and the method of "one factory, one policy, one enterprise docking with one university and scientific research institute" should be adopted to help enterprises to innovate independently, transform and upgrade. leading industries: hardware and stainless steel products, high-end machinery and equipment manufacturing, and emerging strategic industries of electronic information
Chinese PinYin : Guang Dong Sheng Jie Yang Shi Jie Dong Qu Zhu Hai Jie Yang Chan Ye Zhuan Yi Gong Ye Yuan
Zhuhai (Jieyang) industrial transfer park, Jiedong District, Jieyang City, Guangdong Province
Wulaga Town, Jiayin County, Yichun City, Heilongjiang Province. Hei Long Jiang Sheng Yi Chun Shi Jia Yin Xian Wu La Ga Zhen
Zhouji Township, Shuyang County, Suqian City, Jiangsu Province. Jiang Su Sheng Xiu Qian Shi Shu Yang Xian Zhou Ji Xiang
Shaoyang Township, Guangfeng District, Shangrao City, Jiangxi Province. Jiang Xi Sheng Shang Rao Shi Guang Feng Qu Shao Yang Xiang
Jin Gang street, Wolong District, Nanyang City, Henan Province. He Nan Sheng Nan Yang Shi Wo Long Qu Jin Gang Jie Dao
Hailuo Township, Jianyang City, Chengdu City, Sichuan Province. Si Chuan Sheng Cheng Dou Shi Jian Yang Shi Hai Luo Xiang
Fubian Township, Xiaojin County, Aba Tibetan and Qiang Autonomous Prefecture, Sichuan Province. Si Chuan Sheng A Ba Cang Zu Qiang Zu Zi Zhi Zhou Xiao Jin Xian Fu Bian Xiang
Dayan street, Gucheng District, Lijiang City, Yunnan Province. Yun Nan Sheng Li Jiang Shi Gu Cheng Qu Da Yan Jie Dao
Huanghe street, Huanggu District, Shenyang City, Liaoning Province. Liao Ning Sheng Shen Yang Shi Huang Gu Qu Xia Xia Jie Dao Huang He Jie Dao
Gaoqiao Town, Xinning County, Hunan Province. Hu Nan Sheng Xin Ning Xian Gao Qiao Zhen