Shenyang Olympic Sports Center project is a three hall layout, with "one stadium" as the main stadium and "three halls" as comprehensive gymnasium, natatorium and tennis hall. The main stadium is the top priority of the construction of the Olympic Sports Center. The construction area of the main stadium of the Olympic Sports Center is 140000 square meters, accounting for more than half of the total area of the Olympic Sports Center. After completion, 60000 spectators can watch the Games in the stadium at the same time.
Shenyang Olympic Sports Center Stadium
synonym
Shenyang Olympic Sports Center generally refers to Shenyang Olympic Sports Center
Shenyang Olympic Sports Center, referred to as "Shenyang Olympic Sports Center", is a sports center located in Shenyang City, Liaoning Province. The project has a layout of three stadiums in one stadium, "one stadium" is the main stadium Wulihe Stadium; "three stadiums" are comprehensive gymnasium, natatorium and tennis stadium. The main stadium is the top priority of the construction of the Olympic Sports Center, because it needs to inherit the glory of the old Wulihe Stadium. The construction area of the stadium is 140000 square meters, accounting for more than half of the total construction area of the Olympic Sports Center. After completion, 60000 spectators can watch the Games in the stadium at the same time.
Venue location
Shenyang Olympic Sports Center is built in Hunnan District, Shenyang City, Liaoning Province. The center coordinates are 123 ° 27 ′ 22 ″ E and 41 ° 44 ′ 13 ″ n. The location range is west of Fumin Street, east of Hunhe street, north of Hunnan Avenue, south of Hunnan 4th Road and Hunnan 5th Road.
Architectural design
The planned land for construction is 54.59 hectares (42.95 hectares within the red line), with a total construction area of 29699 square meters.
Among them: a stadium that can accommodate 60000 people (underground structure layer, 6 floors above ground, including a natural turf football match field with standard plastic track and track and field competition function conforming to FIFA standard and a natural turf football warm-up training field with standard plastic track, 1-6 floors of various buildings, 138888 square meters);
A gymnasium capable of accommodating 10000 people (Main Gymnasium and training hall, underground structure layer, 4 floors above ground, including indoor ball games, gymnastics, ice sports competition field and training ground, 1-4 floors of all kinds of buildings, 5.057 million square meters);
A natatorium with a capacity of 4000 people (underground structural floor, three floors above the ground, including indoor water sports swimming, synchronized swimming, platform diving, springboard diving, water polo arena and training ground, 1-3 floors of all kinds of buildings, about 37100 square meters);
A tennis hall with capacity of 4000 people (underground structure layer, 2 floors above ground, including No.1 indoor field with capacity of 4000 people, 3 outdoor No.2 and No.3 fields and training fields with capacity of 2000 people, 14700 square meters of various buildings on 1-2 floors), 157700 square meters of air corridor on the second floor, 19280 square meters of main access platform on the second floor, and one platform on the third floor of gymnasium The construction area of the lower indoor parking lot is 9300 square meters, and that of the swimming pool and tennis hall is 113900 square meters. The construction area of the administrative, business office and logistics rooms, general equipment rooms and other public spaces is included in the total construction area of 29699 square meters. There are 2520 parking vehicles (including 1415 stadiums) in the parking lot There are 625 gymnasiums, 480 natatoriums and tennis halls, including 500 buses), 2730 vehicles (730 in Beijie district and 2000 in Nanjie District) can be parked in the temporary parking lot outside the land area, with a total of 5250 vehicles; 3000 bicycles and 180 disabled vehicles can be parked in the non motor car parking lot within the land area.
Venue structure
The stadium roof, with its unique personality of soft and gentle curve, is like the light wings falling from the sky to the broad green hills, connecting with the artificial ground, and coordinating with the rich water and the surrounding environment.
With the crown of olive leaf awarded to the winner as the design concept, a large roof with a total length of more than 300 meters is designed, which is composed of glass and metal. Like breathing skin, the roof adapts to the change of climate in four seasons, effectively regulates the influence of light, heat and wind, and creates an ideal competitive environment. This is consistent with the theme of combining nature and ecology in Shenyang's urban environmental construction. This kind of stadium with the most advanced high-tech technology will not only become a representative Sports Center in China, but also in the world.
Central building
stadium
From the appearance, the main stadium is like the crystal crown in the hands of the goddess of victory, while the three indoor stadiums in the east-west direction are like a pair of wings of the goddess of victory. " The relevant person in charge of Shenyang Municipal Planning Bureau interprets the design concept of the Olympic Sports Center in this way.
It is composed of two main structures, the grandstand part adopts reinforced concrete structure, and the roof adopts arched steel structure. The arched roof is composed of six pieces of steel structure, and the East and the West are divided into three pieces. This structural layout not only reduces the construction difficulty, but also makes the appearance of the venue streamline.
In the design of the main stadium, the main stadium of the Olympic Sports Center has applied many international popular concepts. In the six arched films, there is a certain gap between each two films, which not only ensures the air circulation in the venue, but also effectively avoids the problems of echo in other large venues and the audience can not hear the broadcast clearly. What is remarkable is that the roof of the main stadium is made of transparent materials such as sunlight plate and glass, which makes the lawn in the stadium fully enjoy the sunlight and improves the maintenance cycle of the lawn. In addition, the main stadium of the Olympic Sports Center will break the three-tier stand mode of most stadiums and adopt a two-tier stand structure.
The view of the third floor stands is very steep. It's very inhumane for the audience sitting on the third floor to watch the game. By contrast, the two floors stand is much more comfortable. In addition, there are 100 VIP boxes specially set up between the first and second floor stands to welcome the arrival of domestic and foreign guests.
Gymnasium
The comprehensive gymnasium is a three-story reinforced concrete frame structure. The grandstand is divided into two floors of high and low areas. The second floor of the middle part of the western area of the competition hall is used as private rooms. The roof of the grandstand is a steel structure bearing system and a metal plate cover. The warm-up training hall is located in the east of the competition hall. It is mainly used for warm-up training of athletes and training of training teams of Liaoning Provincial Sports Bureau.
natatorium
The natatorium is equipped with a swimming competition pool, a diving pool and a swimming training pool.
① The swimming pool is 50m long and 25m wide, with 10 lanes, starting platforms at both ends and lane dividing line hooks at the end. Two ladders are set on both sides of the pool, and stainless steel handrails are set on the pool bank. The swimming pool can meet the requirements of synchronized swimming and water polo. The male and female handball doors are installed with hooks in the overflow tank of the swimming pool. (2) the diving pool is 25m long, 21m wide and 6m deep. One side of the diving pool is set with 1m, 3M, 5m, 7.5m and 10m diving platforms, and the other side is set with 2 0.75m springboards, 3 1m springboards and 4 3M springboards. (3) the training pool is 50m long and 25m wide, with 10 swimming lanes and departure platforms at both ends. In order to meet the requirements of 25m swimming training, 18 25m swimming lanes are set horizontally in the swimming pool, and the hooks of 50m and 25m Lane dividing lines are set respectively. Two ladders are set on both sides of the pool, and stainless steel handrails are set on the pool bank.
Tennis Center
A standard tennis court is set up in the tennis hall, which can be used for tennis finals. The straight tennis column is set up. The holes of the tennis column are embedded in the court, and the special surface of acrylic tennis court is laid on the ground layer of the tennis court. The tennis hall uses the room roof space, sets up the air training runway, and paves 9 mm thick rubber runway. In order to improve the utilization rate of the tennis hall, it can be used as a comprehensive gymnasium when the movable wood floor is laid in the court. The court can carry out indoor sports such as basketball, volleyball (the court is equipped with straight volleyball column), badminton, table tennis and so on.
Ten tennis training grounds are set up in the tennis training hall. The surface layer of the court is made of acrylic special materials for tennis courts, and straight tennis columns are set up.
A total of 12 tennis courts are set up outdoors, including 2 semi-finals and 10 training grounds. The surface layer of the court is made of acrylic special material for tennis court, and the in-line tennis column is set.
Function
"The construction of Shenyang Olympic Sports Center is based on sports technology, and has reached the acceptance standard of national and international first-class stadium. It is a high-quality project comparable to the" bird's nest ". This is the high praise given by the expert group of the State Administration of work safety and the General Administration of sports to Shenyang Olympic Sports Center on May 28. On the same day, Shenyang Olympic Sports Center passed the last and highest level safety acceptance, becoming the first stadium in China to conduct safety evaluation.
Usher in the examiner
On May 28, 2008, relevant leaders of the State Administration of work safety and the State General Administration of sports, as well as experts from Beijing Institute of architectural design and research, Northeastern University and Shanghai Institute of construction design and research gathered in Shenyang for the final acceptance of the safety facilities of the completed Shenyang Olympic Sports Center. The expert group announced that the completion acceptance of safety facilities of Shenyang Olympic Sports Center project passed smoothly. Chen Jianzhi, director of Shenyang Municipal Administration of work safety, said: "this is the highest level of safety acceptance in China, and the Olympic Sports Center is also the first one in China to carry out this project
Chinese PinYin : Shen Yang Ao Ti Zhong Xin
Shenyang Olympic Sports Center
Cangnan shijutang scenic spot. Cang Nan Shi Ju Tang Feng Jing Ming Sheng Qu
Hezhang National Forest Park. He Zhang Guo Jia Ji Sen Lin Gong Yuan
403 International Art Center. Guo Ji Yi Shu Zhong Xin