The capital gymnasium was built in 1968. It covers an area of seven hectares and can accommodate 18000 spectators. It is the largest modern gymnasium in Beijing. It often holds table tennis, badminton, volleyball, basketball, gymnastics, skating and other competitions. It is also a venue for many singers to hold concerts.
Capital Gymnasium
The capital gymnasium was built in 1968, with a construction area of about 53000 square meters. It is a comprehensive and multi-functional gymnasium and one of the important sports and cultural venues in Beijing. In the 38 years since its completion, it has undertaken many international and domestic sports competitions and training, as well as large-scale artistic performances. In order to meet the needs of volleyball competition and training in 2008 Olympic Games, the capital gymnasium has carried out a large-scale reconstruction project. After the renovation, the building area of the capital gymnasium will be increased to about 54600 square meters, meeting the functional needs of the International Olympic Committee and international sports organizations. The reconstruction project mainly includes the competition hall, comprehensive training hall and the auxiliary room for the competition time. The expansion part mainly includes the ticket hall and four goods storage places. In addition, the environment of the library area should be reconstructed and repaired. The reconstructed capital gymnasium can not only meet the requirements of volleyball training and competition in 2008 Olympic Games, but also meet the requirements of other large-scale activities after the games.
As the ice sports venue of Beijing 2022 Winter Olympic Games, the renovation will start before the end of 2018.
Development history
The capital gymnasium is the largest, most functional and most widely used gymnasium in Beijing. It is surrounded by Beijing Zoo in the East, Zizhuyuan Park and National Library of China in the West. The capital gymnasium started construction on June 1, 1966 and was officially put into use in October 1968. The whole project cost more than 15 million yuan from design and construction to materials and equipment.
The capital gymnasium was built in the 1960s. The reconstruction and expansion of the Olympic project has added new vitality to the capital gymnasium, adding 12 audience boxes on the East and west sides of the competition venue, setting up two elevators on the East and west sides of the gymnasium, and improving ventilation, air conditioning, radio and sound facilities to better serve the audience.
In addition, some seats are reduced and the distance between seats is increased. Because the seats of Shouti were changed during the bidding period, for the sake of thrifty hosting the Olympic Games, the audience seats were basically unchanged. But the first body, which could hold 18000 people, ended up with 17500 seats. In addition, in order to meet the needs of large-scale activities, the front half of the rostrum is movable and can rise and fall automatically. It is understood that these "activities" podium after all put away, can expand the area of 120 square meters for the stadium
The capital gymnasium, which is nearly 50 years old, has been transformed into an Olympic project after holding many international competitions and large-scale activities. The reconstruction and expansion of the capital gymnasium has added new vitality. As the main volleyball field of the 2008 Beijing Olympic Games, it will add a glorious page to the history of the capital gymnasium.
The capital gymnasium covers an area of 54707 square meters, and its functions are in accordance with international standards, which fully embodies the connotation of the Olympic spirit. The reconstruction and reinforcement part mainly includes competition hall, comprehensive training hall and game time auxiliary room, and the new part mainly includes ticket hall, four goods deposit offices and registration center.
After the renovation, the appearance of the capital gymnasium has not changed, but two elevators and one climbing ladder have been added to the East and west sides. Among them, the two elevators on the west side of the gymnasium are barrier free elevators. All elevators use Braille and language prompt system. There are language prompts in the process of lifting, which are "speaking" elevators.
The first building was built in the 1960s, when the national building standards and relevant specifications were adopted
It is not perfect enough to meet the needs of modern architecture. The evacuation of the audience in Shouti hall, which can accommodate nearly 20000 people, is a big problem. Therefore, elevators and walking ladders have been added in this renovation to facilitate the evacuation of the audience in case of emergency. " "In addition, functional housing also needs transportation up and down," Han said. Finally, people saw the elevators and ladders in the vertical glass curtain walls on the East and west sides of the head
In order to maintain the original appearance of the building and some special parts, scaffolding, large-scale protection and other measures are adopted in the construction to avoid contact with them as far as possible. In order to avoid the damage to the original building structure, non vibration water drilling method is used to cut the original structure beam slab and concrete wall openings and part of reinforced concrete structure demolition. At the same time, in order to achieve the requirements of non-destructive demolition, coring diamond drilling machine is also used in the cutting and demolition construction.
As an ice sports venue for the 2022 Winter Olympic Games in Beijing, the capital gymnasium has initially formed a renovation plan, which will be started by the end of 2018.
Venue composition
structure
The capital gymnasium covers an area of 7 hectares with a rectangular plane. The building is 122.2 meters long from east to west and 107 meters long from north to south, with a construction area of 40000 square meters. The clear span of the roof of the competition hall is 112 × 99 meters, and the roof structure is flat two-way space steel grid. There are air conditioning, refrigeration system facilities, lighting, public address, radio and television broadcasting, timing and scoring, communication and other modern facilities in the museum.
During the Olympic Games, the capital gymnasium will be used as the main volleyball venue. The renovation and expansion project of the capital gymnasium took one and a half years, with an area of 54707 square meters and 17500 auditoriums. Shouti is a comprehensive gymnasium, which can carry out ball games, Ice Games and large-scale sports activities. The gymnasium has a competition hall, three training halls and six rest halls for the audience. The competition hall is 88 meters long and 40 meters wide. The floor of the competition field can be moved away. After water freezes, ice skating, ice hockey, figure skating and other ice sports can be carried out.
characteristic
In addition to the competition hall, there are three training halls and six rest halls for the audience. The audience mainly enter the competition hall from the south, East and West through the rest hall on the second floor. The first floor is for athletes, referees, staff and VIP. There are also broadcasting, audio, television, fax, time and score, air conditioning and other equipment in the museum.
The competition hall of the gymnasium is composed of 21 movable floors, each of which is 30 meters long and 3.5 meters wide. Below the floor is the skating rink. If you start the machine, the floor can be removed to the East and west sides, and then it will descend layer by layer into the floor bin.
After the floor is removed, the terrazzo floor is exposed. Water is poured on the terrazzo floor. The low-temperature ammonia liquid discharge pipe in the terrazzo can freeze all year round and keep the ice surface at a certain temperature. Even in the hot "dog days", people can still watch Ice Hockey competitions and various skating performances. There are 18 spectator entrances and exits around the venue, which can be evacuated within 5 minutes.
In order to adapt to the different requirements of various sports for large and small venues, there are three kinds of grandstands in the competition hall: movable, semi movable and fixed. The first five rows are the active stands. When playing ice hockey, you can push it in to expand the field. The sixth row to the tenth row of the East and west stands are semi active. In large-scale table tennis competitions, the semi active stands can be removed, and 24 international standard table tennis tables can be placed in the whole competition site at the same time. The front half of the rostrum is active. In order to meet the needs of large-scale meetings, it can automatically rise and fall, extend and expand 120 square meters, and automatically advance to the back of the rostrum when not in use.
The competition hall is equipped with air conditioning system, the indoor temperature is not less than 18 ℃ in winter and not more than 28 ℃ in summer, and the temperature can be kept moderate during freezing.
In order to meet the requirements of international competitions, the capital gymnasium has been renovated in 1985. Dysprosium lamp and iodine tungsten lamp are used in the lighting (dysprosium lamp 400W, iodine tungsten lamp 1000W). After the release, the lighting meets the requirements of international competition, with an average level of illumination of 1500 lux. The electronic time and score equipment is an advanced large screen display device for gymnasium in China. Through this set of equipment, all kinds of information in sports competition can be displayed quickly. In addition, it can also provide Chinese and English materials, such as slogans, slogans, advertisements, speeches, etc. The display board can display the time points of basketball, volleyball, handball, ice hockey and other sports at the same time, and also display different contents. The operation is all controlled by computer; the power of the radio and sound system is more than doubled after the transformation, and the actual power reaches 1500-2000 watts.
According to the notice of Beijing Municipal Planning Commission and Beijing Municipal Bureau of cultural relics on December 19, 2007, the building has been approved by Beijing municipal government to be listed in the list of excellent modern and contemporary buildings in Beijing (the first batch). Many singers choose to hold their concerts in the capital gymnasium.
Function value
Venue
It is 88 × 40m with a net height of 20.65m. It can hold 18000 people.
The site has movable wooden floor, which can be rotated mechanically. When not in use, all the wooden floors are stored in the floor warehouse. The second floor is equipped with ice making equipment, which is directly controlled by the
Chinese PinYin : Shou Dou Ti Yu Guan
Capital Gymnasium
Nanxi River drifting in Hekou. He Kou Nan Xi He Piao Liu
Jade Pagoda kiln site group. Yu Ta Yao Zhi Qun
Zhenshan Ecological Park Lijing hot spring. Zhen Shan Sheng Tai Yuan Li Jing Wen Quan
Beijing Longmen Ecological Resort. Bei Jing Long Men Sheng Tai Du Jia Zhuang Yuan
Jinshan Culture Expo Park. Jin Shan Wen Hua Bo Lan Yuan