Chenjiaci square
On October 17, 2014, in Guangzhou, four years ago, in order to welcome the Asian Games, the Liwan District Government of Guangzhou spent 800 million yuan to build the largest square in Xiguan, Chenjiaci square. But this year, due to the construction of Metro Line 8, the square has been demolished in half and surrounded as a construction site. Some citizens denounced it as too wasteful. The municipal subway company explained that when the square was built, Metro Line 8 had not passed the approval of the national development and Reform Commission, and the Liwan District government could not predict that the square would be partially demolished four years after it was completed.
The media questioned that the Chen ancestral hall square had been demolished as a "short-lived building", and some citizens directly denounced it as too wasteful. On November 20, 2014, when the 12th Provincial People's congress deputies elected by Guangzhou city visited Chenjiaci square, Liwan District government responded, "not only did it not cause waste, but also saved money and accelerated the subway construction
.
brief introduction
Recently, Chenjiaci square, which was built in Guangzhou at a cost of 800 million yuan, has only been used for four years. That is to say, because the subway construction needs to be "knocked down and rebuilt", it has aroused widespread public concern. Chen ancestral temple is one of the cultural cards of Guangzhou. In 2009, more than 800 million yuan was invested in the expansion of the city's Liwan District to form Chen ancestral temple square, which has now been excavated beyond recognition. It is reported that the subway project occupying Chenjiaci square was approved by the national development and Reform Commission in August 2007.
Construction process
The northern extension of Guangzhou Metro Line 8 was approved in August 2007, but Liwan District of Guangzhou spent a lot of money to expand it two years later and will become the Chenjiaci scenic spot of the subway station. People familiar with the matter explained that the project is designed to meet the 2010 Asian Games in Guangzhou. It has heavy tasks and lacks consideration of overall planning.
This can only be said to be an irresponsible explanation. Chenjiaci square is not a temporary construction project. The construction and Planning Department of Liwan district must consider whether the project is compatible with other projects to be built or newly built after the Asian Games. This is not only a basic common sense, but also a clear requirement of the urban and rural planning law and other laws and regulations. Don't prevaricate the public opinion with the short time and neglect of the Asian Games. To make a mistake is to make a mistake. To make a mistake, one must take responsibility. To make a crime, one must lose his official cap and go to jail for the new year.
The procuratorial organ of Guangzhou should intervene in the investigation as soon as possible to find out whether the relevant administrative officials, construction and planning departments of Liwan District had transferred the planning drawings and schemes of other projects to be built and newly built, including the northern extension of Metro Line 8, at the beginning of the planning decision of Chenjiaci square project. If there is no transfer record, and the site selection approval procedure has not been completed, it will prove that the then leader of Liwan District and the officials of the construction and Planning Department of Liwan District have violated the requirements of the urban and rural planning law, and the project belongs to malfeasance operation, so the malfeasance responsibility of these officials should be investigated. If the access records can be found and the site selection approval procedures are complete, the problem will be even more serious. It shows that the relevant officials are fully aware that the newly built square will become a "short-lived building", but they are bent on "burning money". It can not be ruled out that the financial funds can be obtained by reducing the actual construction quality, and the discipline inspection and supervision organs should also conduct a thorough investigation.
Construction layout
Yesterday afternoon, at the construction site of Chenjiaci square, more than a dozen workers were erecting gray bricks for construction enclosure, extending along Kangwang North Road to the junction of Zhongshan No.7 road. The bus terminus of No.268 and no.413 was divided into two parts because of the enclosure wall. The road surface of Zhongshan No.7 road in the south, Longyuan West and other inner streets in the north, and the enclosure wall near Chenjiaci in the West had been built.
The whole square is surrounded by subway construction, and its area is nearly 10000 square meters, accounting for about 50% of the square. In the enclosed area, a large hook machine is in operation. The green land beside the cement floor is beyond recognition. Shrubs and trees are removed. The lawn is full of yellow mud, abandoned steel bars, and yellow wax stone and granite are scattered on the ground. On the pedestrian passageway near the public toilet of the green square, the excavation process of laying cables outside the enclosure is in progress. On the north side of Chenjiaci green square is the famous big stall street. There are nearly 30 big stalls in longyuanli, longyuanxi, longtangheng and other inner streets, and the tables and chairs are set up close to the newly built enclosure wall of the construction site. Along with the Kangwang commercial city at Chenjiaci station of Metro Line 1, the entrance and exit of No. 3 is directly facing the construction site and has not been closed yet.
Address: Kangwang North Road, Liwan District, Guangzhou City, Guangdong Province
Longitude: 113.246455
Latitude: 23.127125
Chinese PinYin : Chen Jia Ci Guang Chang
Chenjiaci square
Qingdao Zhongshan Park . Qing Dao Zhong Shan Gong Yuan
Dalian Radio and TV Tower. Da Lian Guang Bo Dian Shi Ta
Former site of German imperial post office in Qingdao. Qing Dao De Yi Zhi Di Guo You Ju Jiu Zhi
Former residence of Li Xiannian. Li Xian Nian Gu Ju